Will a paver patio last if the contractor skips excavation and installs a very thin base?
No. Proper installation requires excavating to the needed depth, then placing and compacting gravel in 2- to 3-inch layers. A thin or uncompacted base allows settling, shifting, and drainage failure. Skipping these steps typically leads to early cracking, uneven surfaces, and costly repairs.
Will the contractor honor the workmanship warranty and return to fix patio problems?
A written warranty is only useful if the contractor remains in business and responsive. Obtain the warranty terms in writing before work begins, including response time for repairs. Keep records of all communications so you can enforce the warranty if issues appear after completion.
How can I tell whether a bid includes legitimate work or unexplained extras?
Ask for a detailed written scope that lists excavation depth, base thickness, compaction steps, edging, and drainage. Compare each line item across bids. Legitimate extras such as poor soil removal or extra base material should be explained with site photos or soil notes rather than vague line items.
How do I avoid a retaining-wall project dragging on and damaging other parts of the yard?
Require a written schedule with start and completion dates plus daily site protection measures. Specify that excavated soil and materials must be contained. Include a clause for daily liquidated damages if the project exceeds the agreed timeline to protect the rest of the property.
How can I tell whether visible installation flaws mean the contractor is cutting corners?
Check for uneven joint lines, large gaps, pavers not level with each other, and missing or poorly compacted edging. Proper work uses string lines for straight joints and a compacted base. Document flaws with photos and request corrections before final payment.
How risky is it to pay a deposit before the contractor starts the patio?
A modest deposit is common, but large upfront payments increase risk if the contractor fails to perform. Limit the initial payment to 10-20 percent and tie remaining payments to completed phases such as excavation, base, and finished surface. Always use written contracts.
Should I be concerned if a contractor is slow to provide license and insurance information?
Yes. Licensed and insured contractors can supply proof quickly. Delays may indicate expired coverage or unlicensed status. Require certificates before any deposit and confirm the policy covers your property during the project to avoid liability for accidents or damage.
Something we didn't cover? (561) 593-1860, asking costs nothing.